The project/experience section would consist of everything on the work that I had
done, from the latest, as follows :-
1.
Science and Music Teacher – Sekolah Kebangsaan Taman
Kosas (2013)
Ø Acts as substitute teacher and a standby teacher for
Madam Noraini Bt. Hamid, who just delivered a baby, for a period of 2 months
(July-August)
Ø Main subjects to teach – Science and Music.
Ø Full standby teacher (cover for on leave’s teacher) for
all subjects, except Kajian Tempatan(Geography) and Kemahiran Hidup.
Ø Involved in regular teaching tasks and environment, such
as delivering knowledge within the schedule given, grading the papers,
maintaining proper teaching classes/rooms and many more. Not to forgot as being
the lead maintenance unit (for a short period) for the music’s instruments,
such as guitars, pianos, radios and etc.
Ø As the main guide teacher for Rumah Merah (Red) for SKTK’s
Sports Day-conducting students, find replacement for any injured player, and
give a full support to the participants with the joy of cheerleader.
Ø Performed as a guitarist for Independence Day
Celebration, on 29th August with the students. The veterans on the
school call it as a farewell performance for me, as I was planned to pursue my
study and check in at UniKL MSI on 1st Sept, 2013.
Sports Day

Singing National Anthem Song
There
are a lot of experiences gained here. On top of that, I was offered a full time
teacher's job, endorsed by the veteran teachers at the school. But then, I
declined it to be a tremendous engineer, as dreamed. Great
memories.
2.
Telephone, CCTV, Power & Network Installation at
Great Business and Service.
Ø
Join on the INTRA
session of the last semester of diploma level for a period of 16 weeks.
Ø
Join in as an
important technical team, who do every difficult job on harsh environments such
as pulling fiber optic from the manhole, terminating Wireless Lan on top of the
roof at Anjung UniMAP, placing a 50pairs network/telephone cables and many
more.
Ø
Several big projects of
wiring and servicing that has been done including at :-
§
University Utara Malaysia
§
University Malaysia Perlis
§
Politeknik Tunku Sultanah Bahiyah
§
Majlis Perbandaran Seberang Perai
§
Majlis Perbandaran Kulim
§
Lembaga Getah Malaysia
§
JPJ Alor Setar
Ø
Joined directly under
the technical manager and network engineer on several tasks like:-
§
Manage, reevaluate and reconstruct the
drawing plan and numberings
§
Sketch roughly for the path of wires
going in and out
§
Determine suitable numbers for each
point of termination, for future detection and any misconduct
§
Lead the small group of 4 other staffs
for termination, and manage all the incomplete wiring.
§
Work as a team, finish as a team.
Wiring for telephone and network at Majlis Perbandaran Kulim is almost finished
by us only, without any supervision from others.
Fiber Optic Termination (Inside Box)
The back of telephone socket
This was the harshest work I've worked so far. With the
dirt, hotness of the sun, and the degree of strength and discipline, I’ve learned
that at first, people see the vendor technical work as ugly. But when I’m into it,
the job feels at ease like a hobby. The boss, GM, TM and Network Engineers asked me to stay, but then I
proposed to pursue my bachelor level.
3. Final Year Project –
Human Body Temperature Detector (Fever Door)
Ø
Project leader for
this FYP
Ø
Objectives:
o
When human temperature
is set to a fever’s degree Celsius, let say >40°C, the door WILL NOT open.
o
When there’s no
change in room temperature, the door WILL NOT OPEN.
o When the temperature is
around 30°C to 40°C, the door WILL OPEN
Ø
Fully involved in
programming part – from the Flowcode V5, to the MPLab, MicroC compiler, and the
programming burner.
Ø
Took almost 3 months
just to finish this programming part, where the hardware is finished, waiting for
the main PIC to go with.
Ø Using MLX90614
infrared sensor as the main sensor for temperature detection, ordered from
Thief River Falls, Minnesota, USA.
Ø
Using power window
motor to open and close the door.
Ø
Using PIR sensor
(pair) to detect movement and then closing the door.
Ø
Using LCD to display
temperature and of course, our name, supervisor and the project’s name.
Ø
Using LEDs as the
indicators (Red and Green)
Ø
2nd Place
(Silver Medal) at International Innovation, Design & Articulation (i-IDeA
2013) competition in UiTM Arau.
Programmable Integrated Circuit (PIC) without output for FYP
View of the back of the PIC
Full view of the project (PIC inside the box)
The final year project is a
success. The development of the project was carried throughout the guidance of
the supervisor and overall subjects that have been learned on the diploma
level. Not to mention, A+ for the project.
4.
Part time jobs (Unrelated to engineering)
Ø Kitchen staff at Texas Instruments Malaysia Sdn Bhd.
o
Part time job when
short semester break for a period of 3 weeks (December 2012)
o
Involved in regular
kitchen staffs work
o
Replenishing food to
the trays
o
Maintain hygienic
workplace
Ø
Home tutor (Science
and Math)
o
Part time job when
short semester break for 4 weeks (June 2011)
o
Home tutor, teaching
basic Science and Math for below 15 years old student
Ø Cashier (Isetan of Japan Sdn. Bhd)
o
Full time job after
SPM for a period of 18 weeks (March-June 2010)
o
Maintaining a bright
full smile to the customers
o
Regular cashier work –
counting moneys
o
Deal with every
questions from the customer
o
Win the most counted
smile card for staffs at 3rd floor
Ø
Banquet staff (Kelab
Darul Ehsan, Selangor)
o
Part time job 2008
for a period of 2 weeks (school holidays)
o
Work is almost the
same like a catering staff
o
Fulfilling the needs
for big function/balls
o
Replenish food and
beverages
o
Maintain cleanliness
and hygienic place







No comments:
Post a Comment